Metspray was engaged by the main contractor to address quality issues that had arisen with the protective coatings to the structural steel by the previous coatings applicator at the Alexandra Park Apartments build.

Project Duration

Area Coated

Metspray provided full on-site removal and re-application of the coating system to bring it up to the current requirements. The team abrasive blasted all the steel, before reapplying the primer, intumescent, and topcoats.

 

This project provided Metspray with unique challenges which we were able to overcome by developing and implementing innovative techniques and processes outside of normal coating industry practices.