Auckland Airport Sign Gantries

Metspray worked closely with Amediate Engineering to solve the logistical, processing, and handling challenges created by the size of the individual pieces that now make up the sign gantries spanning the Southwestern Motorway connection at Auckland Airport.

Project Duration

Area Coated

Each gantry section was between 18 and 24m long, 3.5m high, and 2.5m deep, the largest sections weighing more than 5 tonnes. Navigating these massive sections through our blast room, and into our thermal metal spray booth and open factory coating environment proved challenging with our 5 tonne (load rated) factory cranes. To address this, a combination of gantry cranes and fork hoists were used in the moving and handling process. Metspray achieved a superb commercial finish with only minor handling damage that was touched up onsite, delivering an outstanding result.