Auckland Downtown Ferry Terminal

Metspray provided in-shop and onsite abrasive blasting and coating services for the Auckland Downtown Ferry Terminal Upgrade.

Project Duration

Area Coated

Metspray provided in-shop and onsite abrasive blasting and coating services to 6 pontoons and 3 gangways, coating internal voids and external areas for immersion and above sea level, including the walkways and substructures. A complete end-to-end solution was provided, and as this was critical infrastructure for Auckland Transport, all work was subject to multiple third party inspections.


The steelwork was pre-blasted and a holding primer applied to assist in the extended fabrication time. Once the pontoons were fabricated, they were transported to a custom-built double skinned shelter that was environmentally controlled to prevent delays to the coating schedule. Once fully coated and signed off, the pontoons were lowered into the water by crane and floated from Whangarei to the Auckland Downtown Ferry Terminal for installation.

I'm a 

I'm a paragraph. Click 

Project Gallery

bottom of page