top of page
Project Duration
Sable Engineering engaged Metspray to provide the protective coating system for this two-piece pedestrian bridge on Puhinui Road. The project operated on a limited time frame between fabrication and installation which was easily achieved by our team, with an excellent result delivered to the client.
I'm a
I'm a paragraph. Click
Project Gallery
bottom of page